Lianyungang Lingdong Electromechanical Equipment Co., Ltd. is a manufacturer of gas-liquid two-phase flow and electric auxiliary equipment such as continuous discharge expansion vessels. The agreement is applicable to the self-adjusting liquid level controller of the gas-liquid two-phase flow of the N125 continuous discharge expansion vessel in a thermal power plant. It proposes technical requirements in terms of energy and experimentation. This agreement proposes minimum technical requirements, and the supplier provides gas-liquid two-phase flow manufacturing and corresponding services that comply with the requirements of this agreement and industrial standards. If the demand party has any special requirements other than this agreement, they shall be proposed in writing and agreed upon by both the supply and demand parties. This technical agreement, as an attachment to the purchase contract, has the same legal force as the main text of the contract.
2. Design parameters
2.1 It is a self regulating liquid level controller for continuous discharge of gas-liquid two-phase flow
Hydrophobic capacity: 6t/h
Hydrophobic temperature; 170 ℃
Positive pressure: 0.6~0.8MPa
(Steam side pressure below -: 0.2MPa)
Drain pipe diameter: Ф 89 mm
2.2 The second continuous discharge uses a steam liquid two-phase flow self regulating liquid level controller
Hydrophobic temperature; 110 ℃
Positive pressure: 0.2~0.3MPa
(Steam side pressure below -: 0.05MPa)
3. Specifications and standards for gas-liquid two-phase flow in equipment
The supplier shall design and manufacture according to the standards of gas-liquid two-phase flow and industry standards.
4. Technical requirements for gas-liquid two-phase flow
4.1 The continuous drainage flow rate can be fully automatically adjusted within the range of 6t/h ± 50%.
4.2 Spray nozzle material: 1Cr18Ni9Ti
5. Other requirements for gas-liquid two-phase flow
5.1 All gas-liquid two-phase flow outer surfaces should be treated with appropriate methods and painted. The primer should be applied before the equipment rusts, and the surface paint should be applied after the primer is dry.
5.2 Transportation and storage measures for gas-liquid two-phase flow
The gas-liquid two-phase flow must be completely dry during transportation, and all openings and flange interfaces must be protected to prevent damage, corrosion, or entry of impurities.
6. Supply scope of gas-liquid two-phase flow
Item Name Model Specification Unit Quantity Remarks
1. Self regulating liquid level controller
(Supporting signal regulator) SWQ-IV (80) units 2
(Equipped with interface counter flanges and fasteners)
2 Self regulating liquid level controller
installation and working engineering of coal powder sampler
The installation and operation of the coal powder sampler and mobile coal powder sampler of Lianyungang Lingdong Electromechanical Equipment Co., Ltd. drill holes on the flue, extend the sampling tube into the flue, and make the sampling head face the direction of the incoming smoke flow.
squirting air extractor
Assembly and installation of oil injectors
The oil supply and lubrication oil injectors are completely identical in structure, mainly composed of orifice nozzles, diffusion tubes, sleeves, filters, etc.
The function of an oil injector is to use a small amount of lubricating oil as power
The function of the oil injector of Lianyungang Lingdong Electromechanical Equipment Co., Ltd. is to use a small amount of lubricating oil as power, suck in a large amount of oil, and supply lubricating system and main oil pump with oil at a certain pressure.
The principle of steam jet pump and steam injector
A steam injector is a device that is powered by steam and is needed in modern engineering. It does not require electricity, has no moving or rotating parts, is simple in system, and works reliably, so it is used.
The basic principle of lubricating oil system injectors
The oil injector is composed of a nozzle, a filter screen, an expansion pipe, and an inlet pipe. in addition to supplying the inlet oil of the centrifugal main oil pump, it also supplies lubricating oil system and sealing oil system oil.
Portable constant velocity fly ash sampler for regular coal powder sampling on the air and coal powder pipeline
The portable constant velocity fly ash sampler produced by Lianyungang Lingdong Electromechanical Equipment Co., Ltd., also known as the fly ash constant velocity sampler or the swirling fly ash constant velocity sampler,
Working status of oil injector and main oil pump
The working status of the oil injector and main oil pump, the analysis of the reasons for the drop in the inlet oil pressure test of the main oil pump of a 200MW steam turbine, and the composition of the oil supply system of the 200MW steam turbine generally adopt a centrifugal main oil pump oil supply system with dual injectors.
Working principle of automatic steam liquid two-phase flow trap
The automatic steam liquid two-phase flow steam trap, also known as the gas-liquid two-phase flow control valve, is suitable for the water level self operated intelligent control of pressure vessels such as high and low pressure heaters, continuous discharge expansion vessels, raw water heaters, and heating network heaters in the power industry.
The functions of lubrication oil tank injector 1 # and injector 2 # for steam turbines
The oil injectors produced by Lianyungang Lingdong Electromechanical Equipment Co., Ltd. generally consist of nozzle filters, expansion pipes, inlet pipes, etc., and are installed on the main oil pump.
The steam seal heater adopts a horizontal U-shaped surface heat exchan...
The steam seal cooler generally adopts a horizontal U-shaped surface h...
The air cooler adopts finned tube material, single metal finned tube a...
The waste heat recovery device, also known as the energy collector and...
The U-shaped tube is used as a cooling tube for heat exchange tubes, a...
Overview of condenser tube replacement and condenser stainless steel t...
Welded steel pipes (also known as slotted pipes and welded pipes) are ...
Manufacturer of shaft seal heaters, also undertaking pipe replacement ...
Steam turbine oil-water cooler pipe replacement, marine oil-water cool...
When purchasing a column type oil cooler for tube and core replacement...
The automatic steam liquid two-phase flow steam trap, also known as th...
The oil injectors produced by Lianyungang Lingdong Electromechanical E...
The oil injector is composed of a nozzle, a filter screen, an expansio...
A steam injector is a device that is powered by steam and is needed in...
Calculation of cooling area of sampling cooler 1: If the sample flow r...
The sampling of fly ash sampler is selected on the flue between the ou...
The use of carbon steel material in coal powder samplers has caused ma...
The working status of the oil injector and main oil pump, the analysis...
The oil supply and lubrication oil injectors are completely identical ...
The installation and operation of the coal powder sampler and mobile c...
The manual mobile coal powder sampler produced and manufactured by Lia...
The oil injector of Lianyungang Lingdong Electromechanical Equipment C...
Vapor-liquid two-phase flow is used in continuous sewage expansion vessel生產廠家Keep up on our always evolving product features and technology. Enter your e-mail and subscribe to our newsletter.
Vapor-liquid two-phase flow is used in continuous sewage expansion vessel生產廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved
Tel
0518-85370171